Challenges & Pain Points
- Building a new HV line will cost € 24 M with a 5-year delivery time.
Our Solution
ADR Sense was installed in 3 months, allowing a 50% increase in capacity, thus avoiding line congestion.
Typical example: Ampacimon allows optimized use of existing lines in case of grid integration of renewable sources.